Microsoft (MSFT.O) said the Pecos data center campus, once operational, will coordinate operations with an on-site natural gas-fired power plant.

2026-06-22

Microsoft (MSFT.O) said the Pecos data center campus, once operational, will coordinate operations with an on-site natural gas-fired power plant.