Open Account
Demo Account
About Us
Real-time Quotes & News
Market Analysis
Economic Calendar
Daily Market Analysis
Trading Platform
Platform Overview
How To Use
Terms
All Terms
Deposit & Withdrawal
Promotion
FAQ
Contact
繁
简
EN
User Login
Open Account
Demo Account
繁
简
EN
User Login
Open Account
Demo Account
About Us
About Aspire
Features of Aspire
Real-time Quotes & News
Real-time Quotes
Real-time News
Market Analysis
Economic Calendar
Market Analysis
Trading Platform
Meta Trader 5
Platform Features
Terms
All Terms
Deposit & Withdrawal
Promotion
FAQ
Contact
About Us
Terms
Metals Market
Trading Platform
Market Analysis
Promotion
FAQ
Contact
繁
简
EN
China YTD through August national power generation installed capacity rose 11.1% YoY, versus 11.0% previously.
2026-09-24
China YTD through August national power generation installed capacity rose 11.1% YoY, versus 11.0% previously.
Back
Other News
2026-09-24
1. Report: TSMC's wafer foundry prices are confirmed to rise again, by approximately 3% to 6%. 2. Latest disclosure from a major short seller: Significantly increased short positions in Micron, Nebius, and other companies. 3. TrendForce data: DRAM
1. Report: TSMC's wafer foundry prices are confirmed to rise again, by approximately 3% to 6%. 2. Latest disclosure from a major short seller: Significantly increased short positions in Micron, Nebius, and other companies. 3. TrendForce data: DRAM memory module industry revenue is expected to surge 59% in 2025. 4. First substantial victory: Yangtze Memory wins 3D NAND patent battle in Germany, Micron faces sales ban. 5. Powerchip Memory: Orders for consumer-grade and industrial-grade DRAM continue to rise, with prices fluctuating according to market conditions. 6. JPMorgan: HBM specification downgrade does not change the underlying shortage; demand is projected to grow at a CAGR of 63% from 2026-2028. 7. Reports indicate that Samsung Electronics' first-generation sub-10nm DRAM will adopt a hybrid bonding structure. 8. Huawei and Zhongcheng Technology launch new professional storage services. 9. Samsung has completed 16GB LPDDR6 verification on the Snapdragon 8 Elite Extreme Gen 6. 10. Samsung Electric: A subsidiary signed a contract for a US data center energy storage oil-fired power conversion project worth approximately 885 million yuan. 11. Microsoft Surface Pro 12 and Laptop 13 upgraded to Qualcomm Snapdragon X2 Plus processors, with base memory increased from 8GB to 16GB, and prices significantly increased.
2026-09-23
Fed Governor Barr said multiple factors have reduced U.S. housing affordability.
Fed Governor Barr said multiple factors have reduced U.S. housing affordability.
Chat with us
, powered by
LiveChat