Shenghong Co. will raise prices across its electric power-quality, charging/swapping, energy-storage microgrid, battery formation and test, and residential storage product lines by 10%-30% effective July 21, 2026; the increase will not be applied retroactively to orders already in transit. The company says the move is a forced pass-through after core raw-material costs and lead times rose sharply: gold, silver, copper and tin up 30%-200%; PCBs, memory chips, magnetic components, SMD resistors/ca

2026-07-11

Shenghong Co. will raise prices across its electric power-quality, charging/swapping, energy-storage microgrid, battery formation and test, and residential storage product lines by 10%-30% effective July 21, 2026; the increase will not be applied retroactively to orders already in transit. The company says the move is a forced pass-through after core raw-material costs and lead times rose sharply: gold, silver, copper and tin up 30%-200%; PCBs, memory chips, magnetic components, SMD resistors/capacitors, IGBT chips, isolation driver chips, and breakers/relays up 50%-800% and still rising. Manufacturing costs have climbed markedly since early 2026; Shenghong says supply-chain optimization and lean measures have been insufficient and the existing price structure no longer covers cost increases.