開設賬戶
模擬帳戶
關於我們
即時報價及新聞
市場分析
財經日曆
每日市場分析
交易平台
下載及介紹
使用教學
交易細則
各項細則
資金提存
推廣和資訊
常見問題
聯絡我們
繁
简
EN
客户登入
開設賬戶
模擬帳戶
繁
简
EN
客户登入
開設賬戶
模擬帳戶
關於我們
上志國際介紹
上志國際特點
即時報價及新聞
即時報價
即時新聞
市場分析
財經日曆
市場分析
交易平台
平台特點
平台教學
交易細則
各項細則
資金提存
推廣和資訊
常見問題
聯絡我們
關於我們
交易細則
貴金屬市場
交易平台
市場分析
推廣和資訊
常見問題
聯絡我們
繁
简
EN
日本央行委員佐藤綾野:財政和貨幣政策各自發揮作用至關重要。
2026-06-30
日本央行委員佐藤綾野:財政和貨幣政策各自發揮作用至關重要。
返回
其他消息
2026-06-30
Today (30th), with the final unit at the Shaping I hydropower plant on the Dadu River synchronized to the grid, the Dadu River hydropower base added over 2.0 GW of clean capacity, making it among the first river basins to deliver concentrated, large-scale hydropower commissioning under China’s 15th Five-Year Plan. Sichuan’s total clean-energy installed capacity has exceeded 130 GW, with hydropower accounting for roughly 80% of the mix. In the Yalong River water-wind-solar integrated base, the wo
Today (30th), with the final unit at the Shaping I hydropower plant on the Dadu River synchronized to the grid, the Dadu River hydropower base added over 2.0 GW of clean capacity, making it among the first river basins to deliver concentrated, large-scale hydropower commissioning under China’s 15th Five-Year Plan. Sichuan’s total clean-energy installed capacity has exceeded 130 GW, with hydropower accounting for roughly 80% of the mix. In the Yalong River water-wind-solar integrated base, the world’s largest hybrid pumped-storage project, the Lianghekou hybrid pumped-storage power station, has entered a critical phase of full-scale construction.
2026-06-30
The CCP Politburo met on June 30, chaired by Xi, and instructed accelerated flood and drought prevention and relief. It ordered prioritizing citizens’ safety, improving monitoring and forecasting precision, and conducting timely, decisive evacuations to avoid mass casualties. The Politburo demanded strengthened flood protection for major rivers and lakes and tighter control of river/lake flow corridors, while treating rapid shifts between drought and flood as a key risk and pursuing both flood a
The CCP Politburo met on June 30, chaired by Xi, and instructed accelerated flood and drought prevention and relief. It ordered prioritizing citizens’ safety, improving monitoring and forecasting precision, and conducting timely, decisive evacuations to avoid mass casualties. The Politburo demanded strengthened flood protection for major rivers and lakes and tighter control of river/lake flow corridors, while treating rapid shifts between drought and flood as a key risk and pursuing both flood and drought measures. It called for unified water-source management and scheduling, enhanced inspections and protections for major infrastructure and construction projects, and reinforcement of agricultural infrastructure. Authorities were told to ensure fast, efficient rescue and relief capacity via pre-positioning of forces, equipment and supplies, and to shift resources and personnel to grassroots/frontline units to boost local disaster-response capability and safeguard basic living needs of affected populations.
Chat with us
, powered by
LiveChat