开设账户
模拟账户
关于我们
即时报价及新闻
市场分析
财经日历
每日市场分析
交易平台
下载及介绍
使用教学
交易细则
各项细则
资金提存
推广和资讯
常见问题
联络我们
繁
简
EN
客户登入
开设账户
模拟账户
繁
简
EN
客户登入
开设账户
模拟账户
关于我们
上志国际介绍
上志国际优势
即时报价及新闻
即时报价
即时新闻
市场分析
财经日历
市场分析
交易平台
平台特点
平台教学
交易细则
各项细则
资金提存
推广和资讯
常见问题
联络我们
关于我们
交易细则
贵金属市场
交易平台
市场分析
推广和资讯
常见问题
联络我们
繁
简
EN
美国电网PJM发布警报,通知发电调度员尽快启动所有离线发电机组,并将其功率提升至满负荷(紧急最大功率)。
2026-07-03
美国电网PJM发布警报,通知发电调度员尽快启动所有离线发电机组,并将其功率提升至满负荷(紧急最大功率)。
返回
其他消息
2026-07-03
In a CNBC interview, Trump declined to say whether the US would take a 5% stake in OpenAI after a Financial Times report on a potential deal, instead highlighting the US government's stake in Intel. He cited last August's $8.9bn investment in Intel common stock that gave the US government a 10% holding and said he had demanded a 10% stake in return for fixing the company's problems.
In a CNBC interview, Trump declined to say whether the US would take a 5% stake in OpenAI after a Financial Times report on a potential deal, instead highlighting the US government's stake in Intel. He cited last August's $8.9bn investment in Intel common stock that gave the US government a 10% holding and said he had demanded a 10% stake in return for fixing the company's problems.
2026-07-03
The State Council released the Beautiful China 15th Five-Year Plan, tightening soil and groundwater environmental controls. It mandates intensified soil-source pollution prevention, mandatory control and remediation for key soil-polluting operators and promotion of green upgrades. Authorities will strengthen risk management and a remediation-listing system for construction land, and tighten soil controls on vacated sites from pesticide active-ingredient manufacturers and coking plants. The plan
The State Council released the Beautiful China 15th Five-Year Plan, tightening soil and groundwater environmental controls. It mandates intensified soil-source pollution prevention, mandatory control and remediation for key soil-polluting operators and promotion of green upgrades. Authorities will strengthen risk management and a remediation-listing system for construction land, and tighten soil controls on vacated sites from pesticide active-ingredient manufacturers and coking plants. The plan aims to substantially complete heavy-metal pollution remediation of agricultural land in priority counties and reach a contaminated farmland safe-use rate of at least 95%. Measures also include protecting black soil, treating acidified cropland, and stepped-up environmental management of groundwater pollution priority zones, including a groundwater remediation campaign for chemical industrial parks.
Chat with us
, powered by
LiveChat