开设账户
模拟账户
关于我们
即时报价及新闻
市场分析
财经日历
每日市场分析
交易平台
下载及介绍
使用教学
交易细则
各项细则
资金提存
推广和资讯
常见问题
联络我们
繁
简
EN
客户登入
开设账户
模拟账户
繁
简
EN
客户登入
开设账户
模拟账户
关于我们
上志国际介绍
上志国际优势
即时报价及新闻
即时报价
即时新闻
市场分析
财经日历
市场分析
交易平台
平台特点
平台教学
交易细则
各项细则
资金提存
推广和资讯
常见问题
联络我们
关于我们
交易细则
贵金属市场
交易平台
市场分析
推广和资讯
常见问题
联络我们
繁
简
EN
Hang Seng index futures night session closed up 0.78% at 23,498, trading at a 162-point premium to the cash index.
2026-06-24
Hang Seng index futures night session closed up 0.78% at 23,498, trading at a 162-point premium to the cash index.
返回
其他消息
2026-06-24
Meta Platforms(META.O):(关于美国政府人工智能审查)在我们处理细节的同时,希望尽快签署协议。
Meta Platforms(META.O):(关于美国政府人工智能审查)在我们处理细节的同时,希望尽快签署协议。
2026-06-23
Surging AI compute has pushed optical-interconnect valuations higher and amplified stock volatility. A SemiAnalysis report alleging delays to CPO (co‑packaged optics) mass production sparked a global sell-off in optical-communications names; NVIDIA executives denied a delay at a Taipei event and industry contacts say CPO mass production has not been postponed. Market confusion appears to conflate small‑batch validation with full industry rollout. Multiple industry sources identify indium‑phosphi
Surging AI compute has pushed optical-interconnect valuations higher and amplified stock volatility. A SemiAnalysis report alleging delays to CPO (co‑packaged optics) mass production sparked a global sell-off in optical-communications names; NVIDIA executives denied a delay at a Taipei event and industry contacts say CPO mass production has not been postponed. Market confusion appears to conflate small‑batch validation with full industry rollout. Multiple industry sources identify indium‑phosphide laser chips as the binding constraint: long photonic‑chip fab buildouts and extended customer validation cycles make lasers the current capacity bottleneck. Strategically, CPO remains the long‑term solution for hyperscale model training clusters, but near term NPO, LPO and conventional pluggable modules are likely to operate in parallel to meet ultra‑high bandwidth demand. Deployment will be upstream‑capacity led and phased; compute‑bandwidth demand remains robust.
Chat with us
, powered by
LiveChat